Preventative Maintenance

Flexible Process

  • You Create PM Schedules on a one-schedule-to-one-asset basis.
  • You can create one schedule with many assets attached grouped by asset type, building, vendor, etc.
  • Consolidated PMs allow you to create one schedule with a random selection of assets attached.
  • PM Schedules can be created by usage. When a certain usage such as miles, hours, or other unit of measure has been reached the system will generate a PM work order
  • Work can be assigned to a craftsperson or a vendor when a schedule is created or at the time the work is issued to be done.
  • Automatic generation. The system generates the work orders automatically. No buttons to push, nothing to forget. The work orders appear at the appointed time
  • Estimated hours can be applied to each schedule created.
  • You can create and schedule inspections.

Mobile Ready

  • FacilityTree looks and functions the same way if you are mobile or at a desk. Everything you learn for desktop transfers to mobile.
  • FacilityTree runs on any device that supports a web browser. This includes desktop computers, portable computers, Android tablets, Chromebooks, and iPads. There are no special add-ons, versions, or special installations required.
  • All you need is an internet connection. Any data entered or modified on a mobile device is updated in real-time and is immediately available. There is no need to transfer or synch data between devices.
  • FacilityTree works on all smartphones. The web-based smartphone version is optimized for the small screen. All it requires is a web connection. There is no special app to load.

Notifications

  • The system will send an email reminding you that PM work orders have been generated.
  • Craftsperson notifications can be sent when a work order assigned to them is created.
  • Vendor notifications can be sent when a work order assigned to them is created.

Scheduling

  • Work can be scheduled for any date or time by setting the date of the first PM and a time interval.
  • Seasonal PMs are supported by specifying a date of the first PM and a date of the last PM. When the date of last PM is reached the system automatically increments both dates by one year.
  • All scheduled work, along, with estimated hours for each scheduled PM, is displayed using a calendar or a report. This allows you to adjust project workloads into the future and make adjustments.

Work Management

  • Who is doing the work? Who is most productive? Who is getting their work done? There are work loading reports, productivity reports, and completion reports to answer these questions.
  • There are tools to automate managing the work order in the system.
  • Groups of work orders can be edited, completed, or closed at the same time.

Full Suite of Reporting

  • A partial list of reports 
  • Workload by Craftsperson, Shop, Building, and Time 
  • A suite of aging reports, 30, 60, 90-day, custom date by craftsperson, shop, building, or other combination 
  • Cost, charges, labor, and time reports 
  • Global analysis and summary reporting
see Solutions
Learn More / Request Demo